Class Q permitted development covers planning. It says nothing about asbestos. But a conversion will disturb the roof, the cladding and the fittings, which on an older barn are exactly where asbestos cement is most likely to be.
Why the survey comes first
Before building work, whoever does the work must find out whether asbestos is present, or assume it is (Control of Asbestos Regulations 2012, regulation 5). Asbestos should be removed before major works as far as reasonably practicable (regulation 7). A refurbishment survey of the barn is the usual way to meet both.
What a refurbishment survey involves
- It is fully intrusive in the work area: under floors, behind linings and into the roof
- The area should be empty while it is done
- Every material that the work will disturb is sampled or presumed
- The report says which level of contractor can remove each item
Timing
Book it once you know what the conversion will touch, and before you ask builders to price the job. The report helps them price the asbestos removal properly instead of guessing.
Not sure what your building needs? Call 020 3386 1854. We’ll tell you which survey fits and how many samples to expect, and put the price in writing before anyone visits.
