HSE’s survey guide, HSG264, sets out what a report should hold. Yours should have:
- A summary first: what was found, where, and what needs doing now
- A register of every material: location, extent, product type, and whether it was sampled or presumed
- A material score for each one: product, condition, surface treatment and asbestos type, added up
- Plans and photos so the next builder can find each item
- Lab certificates from an ISO/IEC 17025 accredited laboratory
- Areas not reached, listed clearly and presumed to contain asbestos until checked
What the scores mean
- 10 or more: high, act first
- 7 to 9: medium, plan it
- 5 to 6: low, manage it
- 4 or less: very low
If asbestos is found
Finding it is common. Materials in good condition, out of harm’s way, are often safest left alone, recorded and checked. Slightly damaged material can be sealed or enclosed. Removal is needed when it is badly damaged or in the way of building work, and the report says which level of contractor can do it.
Not sure what your building needs? Call 020 3386 1854. We’ll tell you which survey fits and how many samples to expect, and put the price in writing before anyone visits.
